The project consisted of 120,900 square feet of new construction, which included administrative offices; student services; vocational labs, such as web design, drafting and design, health science, and business technology education; 40 general purpose classrooms with upgraded technology; new art wing, photo studio lab, gymnastics space, dance room, music room, and black box theater; new cafeteria building, technology labs, and an indoor and outdoor dining facility adjacent to a central courtyard. The scope also included new covered walkways between buildings, a new courtyard area, new hardcourts, new central chiller plant; electrical and mechanical systems. The floor and roof system consisted of a pre-stressed structural joists with a structural topping slabs.